ITAC Assessment: UU0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product plastic stretch and shrink wrap
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 120,000
ft2
Annual Production 21,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $475,256 16,900,800
kWh
Electricity Demand $428,064 27,907
kW-mo/yr
Electricity Fees $115,570 -
TOTAL YEARLY COSTS $1,018,890
RECOMMENDED SAVINGS* $71,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $14,031 $23,302 - - $14,031
02 2.7243: Improve air circulation with destratification fans / other methods $4,069 $17,638 $2,613
92,985
kWh
$1,456
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $2,776 $6,969 $1,027
36,551
kWh
$1,749
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,274 $495 $851
30,269
kWh
$423
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $701 $1,150 $356
12,679
kWh
$345
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $550 $1,558 $275
9,802
kWh
$275
-
kW-mo/yr
-
07 2.3112: Store heated/ cooled water for use during peak demand periods $24,046 $226,100 $2,550
-
kWh
$21,496
-
kW-mo/yr
-
08 2.2691: Shut off cooling if cold outside air will cool process $23,820 $214,625 $15,997
569,169
kWh
$7,823
-
kW-mo/yr
-
TOTAL RECOMMENDED $71,267 $491,837 $23,669
751,455
kWh
$33,567
-
kW-mo/yr
$14,031
TOTAL IMPLEMENTED $22,700 $49,962 $4,766
169,607
kWh
$3,903
-
kW-mo/yr
$14,031
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs