Assessment Year | 2004 |
---|---|
Principal Product | Induction heating and Melting Equipment |
NAICS | 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing |
SIC | 3567: Industrial Process Furnaces and Ovens |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
100,000
ft2
|
Annual Production | 300
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,495 | 1,403,300 |
kWh
|
$0.036 |
Electricity Demand | $49,712 | 4,782 |
kW-mo/yr
|
$10.40 |
Electricity Fees | $17,310 | - |
|
- |
Natural Gas | $21,327 | 2,739 |
MMBtu
|
$7.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,210 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $15,905 | $15,000 | - | - |
$9,372
-
MMBtu
|
$6,533
-
Tgal
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,050 | $12,800 |
$1,482
39,200
kWh
|
$2,568
-
kW-mo/yr
|
- | - | |
03 | 2.7261: Install timers and/or thermostats | $2,729 | $400 | - | - |
$2,729
-
MMBtu
|
- | |
04 | 2.3132: Recharge batteries on during off-peak demand periods | $2,231 | $300 | - |
$2,231
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $601 | - |
$220
5,818
kWh
|
$381
-
kW-mo/yr
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $345 | $640 |
$126
3,340
kWh
|
$219
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $25,861 | $29,140 |
$1,828
48,358
kWh
|
$5,399
-
kW-mo/yr
|
$12,101
-
MMBtu
|
$6,533
-
Tgal
|
||
TOTAL IMPLEMENTED | $21,210 | $16,340 |
$126
3,340
kWh
|
$2,450
-
kW-mo/yr
|
$12,101
-
MMBtu
|
$6,533
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs