ITAC Assessment: BS0088
ITAC logo
ITAC Assessment: BS0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Plywood and Hardwood Veneer
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 196
Plant Area 300,000
ft2
Annual Production 3,000
thousand feet
Production Hrs. Annual 4,992
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $933,041 21,199,600
kWh
Electricity Demand $456,242 68,515
kW-mo/yr
Electricity Fees $54,997 -
LPG $138,000 5,184
MMBtu
Wood $697,230 548,640
MMBtu
Waste Disposal Costs
Water Usage $111,000 23,173
Tgal
TOTAL YEARLY COSTS $2,390,510
RECOMMENDED SAVINGS* $103,909 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Wood Savings Water Usage Savings
01 2.2136: Install / repair insulation on steam lines $7,541 $11,782 - - $7,541
-
MMBtu
- -
02 2.2126: Lower operating pressure of condenser (steam) $64,374 $480 - - - $45,827
-
MMBtu
$18,547
-
Tgal
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,994 $29,692 $26,436
600,826
kWh
$5,558
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $103,909 $41,954 $26,436
600,826
kWh
$5,558
-
kW-mo/yr
$7,541
-
MMBtu
$45,827
-
MMBtu
$18,547
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs