Assessment Year | 1990 |
---|---|
Principal Product | FLUID MILK, YOGURT, ETC. |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 132,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $607,369 | 11,170,868 |
kWh
|
$0.054 |
Natural Gas | $140,900 | 37,891 |
MMBtu
|
$3.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,105 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,865 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $21,069 | $250 |
$17,982
-
kWh
|
$3,087
-
MMBtu
|
|
02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $15,600 | $4,000 |
$15,600
286,635
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $6,600 | $1,000 |
$6,600
121,336
kWh
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,720 | $2,000 | - |
$3,720
-
MMBtu
|
|
05 | 2.7261: Install timers and/or thermostats | $1,240 | $600 |
$430
17,292
kWh
|
$810
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,110 | $2,000 |
$1,110
20,516
kWh
|
- | |
07 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $665 | $100 | - |
$665
-
MMBtu
|
|
08 | 2.2136: Install / repair insulation on steam lines | $331 | $800 |
$17
293
kWh
|
$314
-
MMBtu
|
|
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,400 | $3,550 |
$1,400
44,256
kWh
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,370 | $4,900 |
$1,370
25,205
kWh
|
- | |
TOTAL RECOMMENDED | $53,105 | $19,200 |
$44,509
515,533
kWh
|
$8,596
-
MMBtu
|
||
TOTAL IMPLEMENTED | $51,865 | $18,600 |
$44,079
498,241
kWh
|
$7,786
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs