ITAC Assessment: CO0186
ITAC logo
ITAC Assessment: CO0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product FLUID MILK, YOGURT, ETC.
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 132,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $607,369 11,170,868
kWh
Natural Gas $140,900 37,891
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,105 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,865

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $21,069 $250 $17,982
-
kWh
$3,087
-
MMBtu
02 2.2614: Use cooling tower or economizer to replace chiller cooling $15,600 $4,000 $15,600
286,635
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $6,600 $1,000 $6,600
121,336
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,720 $2,000 - $3,720
-
MMBtu
05 2.7261: Install timers and/or thermostats $1,240 $600 $430
17,292
kWh
$810
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,110 $2,000 $1,110
20,516
kWh
-
07 2.1242: Minimize boiler blowdown with better feedwater treatment $665 $100 - $665
-
MMBtu
08 2.2136: Install / repair insulation on steam lines $331 $800 $17
293
kWh
$314
-
MMBtu
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,400 $3,550 $1,400
44,256
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,370 $4,900 $1,370
25,205
kWh
-
TOTAL RECOMMENDED $53,105 $19,200 $44,509
515,533
kWh
$8,596
-
MMBtu
TOTAL IMPLEMENTED $51,865 $18,600 $44,079
498,241
kWh
$7,786
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs