ITAC Assessment: UU0089
ITAC logo
ITAC Assessment: UU0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product undergarments
NAICS 315240: Women’s, Girls’, and Infants’ Cut and Sew Apparel Manufacturing
SIC 2341: Women's, Misses', Children's, and Infants' Underwear and Nightwear
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 316,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,800
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,461 3,405,600
kWh
Electricity Demand $120,569 11,902
kW-mo/yr
Natural Gas $83,086 12,864
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,810

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $1,110 $4,290 - $1,110
-
kW-mo/yr
-
02 2.2442: Preheat combustion air with waste heat $1,820 $1,500 - - $1,820
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $17,940 $21,000 - - $17,940
-
MMBtu
04 2.7229: Air condition only space necessary $33,020 $2,085 $19,270
636,410
kWh
$13,750
-
kW-mo/yr
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $10,700 $2,000 - - $10,700
-
MMBtu
TOTAL RECOMMENDED $64,590 $30,875 $19,270
636,410
kWh
$14,860
-
kW-mo/yr
$30,460
-
MMBtu
TOTAL IMPLEMENTED $11,810 $6,290 - $1,110
-
kW-mo/yr
$10,700
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs