681
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0989 #03 Y:2018 | 03 | 2018 | Utilize higher efficiency lamps and/or ballasts | $1,686 | $6,881 | |
| OK0989 #02 Y:2018 | 02 | 2018 | Utilize higher efficiency lamps and/or ballasts | $184,161 | $201,131 | |
| OK0989 #01 Y:2018 | 01 | 2018 | Install compressor air intakes in coolest locations | $1,205 | $944 | |
| OR0701 #04 Y:2018 | 04 | 2018 | Utilize higher efficiency lamps and/or ballasts | $1,441 | $4,175 | |
| OR0701 #03 Y:2018 | 03 | 2018 | Size electric motors for peak operating efficiency | $11,954 | $11,773 | |
| OR0701 #02 Y:2018 | 02 | 2018 | Use steam condensate for hot water supply (non-potable) | $17,929 | $8,549 | |
| OR0701 #01 Y:2018 | 01 | 2018 | Install system to collect scrap | $35,903 | $29,900 | |
| NC0610 #07 Y:2018 | 07 | 2018 | Develop a repair/replace policy | $1,934 | $5,865 | |
| NC0610 #06 Y:2018 | 06 | 2018 | Use optimum size and capacity equipment | $9,484 | $10,000 | |
| NC0610 #05 Y:2018 | 05 | 2018 | Use optimum size and capacity equipment | $4,293 | $10,000 | |
| NC0610 #04 Y:2018 | 04 | 2018 | Reduce the pressure of compressed air to the minimum required | $981 | $100 | |
| NC0610 #03 Y:2018 | 03 | 2018 | Eliminate or reduce compressed air usage | $1,006 | $1,350 | |
| NC0610 #02 Y:2018 | 02 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,172 | $200 | |
| NC0610 #01 Y:2018 | 01 | 2018 | Utilize higher efficiency lamps and/or ballasts | $25,309 | $135,942 | |
| BS0091 #04 Y:2016 | 04 | 2016 | Replace electric motors with back pressure steam turbines and use exhaust steam for process heat | $24,685 | $3,100 | |
| BS0091 #03 Y:2016 | 03 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $11,201 | $240 | |
| BS0091 #02 Y:2016 | 02 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $32,806 | $39,830 | |
| BS0091 #01 Y:2016 | 01 | 2016 | Utilize higher efficiency lamps and/or ballasts | $27,778 | $17,240 | |
| OR0679 #06 Y:2016 | 06 | 2016 | Replace boiler | $48,912 | $250,000 | |
| OR0679 #05 Y:2016 | 05 | 2016 | Utilize higher efficiency lamps and/or ballasts | $17,613 | $47,385 |