ITAC Assessment: OK0989
ITAC logo
ITAC Assessment: OK0989
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product wood products
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $100
M
to 500
M
# of Employees 90
Plant Area 600,000
ft2
Annual Production 19,687,500
units
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,849,410 75,644,740
kWh
Electricity Demand $375,068 117,563
kW-mo/yr
Natural Gas $718,178 236,492
MMBtu
Waste Disposal Costs
Water Usage $142,382 593
Tgal
TOTAL YEARLY COSTS $5,085,038
RECOMMENDED SAVINGS* $192,398 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $190,577

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $1,205 $944 $1,205
23,630
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $184,161 $201,131 $169,706
3,327,574
kWh
$14,455
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,686 $6,881 $1,553
30,441
kWh
$133
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,730 $13,456 $4,730
92,742
kWh
-
05 2.7232: Replace existing hvac unit with high efficiency model $616 $5,983 $480
9,395
kWh
$136
-
kW-mo/yr
TOTAL RECOMMENDED $192,398 $228,395 $177,674
3,483,782
kWh
$14,724
-
kW-mo/yr
TOTAL IMPLEMENTED $190,577 $221,468 $175,989
3,450,757
kWh
$14,588
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs