ITAC Assessment: ME0239
ITAC logo
ITAC Assessment: ME0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Hardwood Flooring
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 50,250
ft2
Annual Production 3,500
thousand feet
Production Hrs. Annual 2,160
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,572 2,443,728
kWh
Electricity Demand $90,663 13,296
kW-mo/yr
Electricity Fees $29,567 -
Other Energy $256,173 32,387
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
01 2.2135: Repair and eliminate steam leaks $46,878 $873 - - $46,878
-
MMBtu
- - -
02 4.821: Pay bills on time to avoid late fees $10,701 - - - - - $10,701 -
03 4.642: Install sensors to detect and avoid jams $4,685 $32,332 - - - - - $4,685
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,290 $19,457 $2,944
49,238
kWh
$1,346
-
kW-mo/yr
- - - -
05 2.2136: Install / repair insulation on steam lines $2,074 $239 - - $2,074
-
MMBtu
- - -
06 2.7224: Reduce space conditioning during non-working hours $1,534 $1,671 $(-75.0)
(-1,172)
kWh
$(-75.0)
-
kW-mo/yr
$1,684
-
MMBtu
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,199 $2,276 $1,199
19,930
kWh
- - - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,164 $500 $1,164
19,343
kWh
- - - - -
09 2.7261: Install timers and/or thermostats $798 $940 $798
11,430
kWh
- - - - -
10 2.8121: Apply for tax-free status for energy purchases $487 - - - - - $487 -
11 3.5248: Separate and recycle scrap metal to foundry or for sale $5 - - - - $5
-
lb
- -
TOTAL RECOMMENDED $73,815 $58,288 $6,030
98,769
kWh
$1,271
-
kW-mo/yr
$50,636
-
MMBtu
$5
-
lb
$11,188 $4,685
TOTAL IMPLEMENTED $61,304 $1,612 $1,164
19,343
kWh
- $48,952
-
MMBtu
- $11,188 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs