Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

692

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0728 #02 Y:2019 Install motor voltage controller on lightly loaded motors $29,427 $34,054
OR0728 #01 Y:2019 Reduce the pressure of compressed air to the minimum required $29,023 $34,574
OR0727 #04 Y:2019 Use or replace with energy efficient substitutes $1,255 $770
OR0727 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $6,870 $19,006
OR0727 #02 Y:2019 Adjust / maintain fork lift trucks for most efficient operation $125,609 $904,500
OR0727 #01 Y:2019 Add equipment/ operators to reduce production bottleneck $2,245,906 $300,000
IP0120 #09 Y:2019 Utilize energy-efficient belts and other improved mechanisms $691 $3,215
IP0120 #08 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $4,278 $7,549
IP0120 #07 Y:2019 Utilize higher efficiency lamps and/or ballasts $4,019 $4,963
IP0120 #06 Y:2019 Optimize plant power factor $9,284 $11,128
IP0120 #05 Y:2019 Lower temperature during the winter season and vice-versa $473 $256
IP0120 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $223 $22
IP0120 #03 Y:2019 Turn off equipment during breaks, reduce operating time $348 -
IP0120 #02 Y:2019 Conserve energy by efficient use of vending machines $835 -
IP0120 #01 Y:2019 Reduce the pressure of compressed air to the minimum required $1,145 $4
OR0718 #03 Y:2019 Ventilation system to shut off when room is not in use $7,386 $27,337
OR0718 #02 Y:2019 Turn off equipment during breaks, reduce operating time $47,893 $5,142
OR0718 #01 Y:2019 Use waste heat from hot flue gases to preheat $84,306 $71,155
NC0628 #06 Y:2018 Optimize plant power factor $785 $1,500
NC0628 #05 Y:2018 Size electric motors for peak operating efficiency $29,932 $120,000