*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Engineered wood products
NAICS 321213: Engineered Wood Member (except Truss) Manufacturing
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 330,000
ft2
Annual Production 30,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $337,055 7,416,530
kWh
Electricity Demand $192,239 16,534
kW-mo/yr
Natural Gas $124,952 23,448
MMBtu
TOTAL YEARLY COSTS $654,246
RECOMMENDED SAVINGS* $62,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,628 $15,967 $2,509
55,274
kWh
$2,119
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $45 $100 $45
998
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $580 $200 $427
9,415
kWh
$153
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,500 $70,000 $19,522
430,000
kWh
$6,978
-
kW-mo/yr
-
05 2.4131: Size electric motors for peak operating efficiency $29,932 $120,000 $16,925
372,800
kWh
$13,007
-
kW-mo/yr
-
06 2.3212: Optimize plant power factor $785 $1,500 - - $785
TOTAL RECOMMENDED $62,470 $207,767 $39,428
868,487
kWh
$22,257
-
kW-mo/yr
$785
TOTAL IMPLEMENTED $580 $200 $427
9,415
kWh
$153
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings