Assessment Year | 2019 |
---|---|
Principal Product | Engineered wood products |
NAICS | 321213: Engineered Wood Member (except Truss) Manufacturing |
SIC | 2439: Structural Wood Members, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
330,000
ft2
|
Annual Production | 30,000
thousand feet
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $337,055 | 7,416,530 |
kWh
|
$0.045 |
Electricity Demand | $192,239 | 16,534 |
kW-mo/yr
|
$11.63 |
Natural Gas | $124,952 | 23,448 |
MMBtu
|
$5.33 |
TOTAL YEARLY COSTS | $654,246 | |||
RECOMMENDED SAVINGS* | $62,470 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $580 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,628 | $15,967 |
$2,509
55,274
kWh
|
$2,119
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $45 | $100 |
$45
998
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $580 | $200 |
$427
9,415
kWh
|
$153
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $26,500 | $70,000 |
$19,522
430,000
kWh
|
$6,978
-
kW-mo/yr
|
- | |
05 | 2.4131: Size electric motors for peak operating efficiency | $29,932 | $120,000 |
$16,925
372,800
kWh
|
$13,007
-
kW-mo/yr
|
- | |
06 | 2.3212: Optimize plant power factor | $785 | $1,500 | - | - | $785 | |
TOTAL RECOMMENDED | $62,470 | $207,767 |
$39,428
868,487
kWh
|
$22,257
-
kW-mo/yr
|
$785 | ||
TOTAL IMPLEMENTED | $580 | $200 |
$427
9,415
kWh
|
$153
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs