ITAC Assessment: AM0511
ITAC logo
ITAC Assessment: AM0511
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Fresh and frozen food packaging
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 180,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,001,880 12,682,000
kWh
Electricity Demand $160,740 30,276
kW-mo/yr
Electricity Fees $500 -
Natural Gas $479,470 58,094
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,345 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,760

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $18,600 $59,000 - $18,600
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $3,600 $2,440 - - $3,600
-
MMBtu
-
03 2.4314: Use synthetic lubricant $2,665 - $2,360
27,800
kWh
$305
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,170 $640 $380
4,450
kWh
$35
-
kW-mo/yr
- $755
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,160 $150 $960
11,265
kWh
$200
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,150 $15 $1,020
12,010
kWh
$130
-
kW-mo/yr
- -
TOTAL RECOMMENDED $28,345 $62,245 $4,720
55,525
kWh
$19,270
-
kW-mo/yr
$3,600
-
MMBtu
$755
TOTAL IMPLEMENTED $19,760 $59,150 $960
11,265
kWh
$18,800
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs