ITAC Assessment: IP0120
ITAC logo
ITAC Assessment: IP0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Veneer
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 78,000
ft2
Annual Production 1,250
thousand feet
Production Hrs. Annual 4,375
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,126 3,579,813
kWh
Electricity Demand $201,803 10,804
kW-mo/yr
Electricity Fees $(-1,681.5) -
Natural Gas $1,983 119
MMBtu
TOTAL YEARLY COSTS $380,231
RECOMMENDED SAVINGS* $21,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,386

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,145 $4 $360
7,711
kWh
$785
-
kW-mo/yr
- -
02 2.6211: Conserve energy by efficient use of vending machines $835 - $540
11,563
kWh
$295
-
kW-mo/yr
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $348 - $348
7,463
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $223 $22 $223
4,773
kWh
- - -
05 2.7221: Lower temperature during the winter season and vice-versa $473 $256 $265
5,671
kWh
- - $208
-
MMBtu
06 2.3212: Optimize plant power factor $9,284 $11,128 - - $9,284 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,019 $4,963 $2,179
41,801
kWh
$1,840
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,278 $7,549 $4,278
91,609
kWh
- - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $691 $3,215 $217
4,638
kWh
$474
-
kW-mo/yr
- -
TOTAL RECOMMENDED $21,296 $27,137 $8,410
175,229
kWh
$3,394
-
kW-mo/yr
$9,284 $208
-
MMBtu
TOTAL IMPLEMENTED $7,386 $8,460 $3,784
76,157
kWh
$3,394
-
kW-mo/yr
- $208
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs