Assessment Year | 2011 |
---|---|
Principal Product | nonferrous sheet metal parts |
NAICS | 333414: Heating Equipment (except Warm Air Furnaces) Manufacturing |
SIC | 3334: Primary Production of Aluminum |
Sales Range | $100 M to 500M |
# of Employees | 109 |
Plant Area |
400,000
ft2
|
Annual Production | 332,000
pieces
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $644,933 | 9,347,200 |
kWh
|
$0.069 |
Natural Gas | $247,062 | 27,919 |
MMBtu
|
$8.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,253 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $6,493 | $1,100 |
$6,493
92,758
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $317 | $110 |
$317
4,526
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $253 | $110 |
$253
3,621
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $8,103 | $2,400 |
$8,103
115,755
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,655 | $800 |
$1,655
23,642
kWh
|
- | |
06 | 2.1116: Improve combustion control capability | $38,690 | - | - |
$38,690
-
MMBtu
|
|
07 | 2.2414: Use waste heat from hot flue gases to preheat | $18,741 | $28,000 | - |
$18,741
-
MMBtu
|
|
TOTAL RECOMMENDED | $74,253 | $32,520 |
$16,821
240,302
kWh
|
$57,431
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs