ITAC Assessment: OR0728
ITAC logo
ITAC Assessment: OR0728
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Hardwood Plywood
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $100
M
to 500
M
# of Employees 230
Plant Area 622,518
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $695,642 17,192,800
kWh
Electricity Demand $301,449 38,455
kW-mo/yr
Electricity Fees $(-51,548.0) -
TOTAL YEARLY COSTS $945,543
RECOMMENDED SAVINGS* $70,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,008

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $29,023 $34,574 $20,636
509,540
kWh
$8,387
-
kW-mo/yr
02 2.4113: Install motor voltage controller on lightly loaded motors $29,427 $34,054 $13,546
334,472
kWh
$15,881
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $8,174 $4,152 $5,877
145,109
kWh
$2,297
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,008 - $1,728
42,675
kWh
$2,280
-
kW-mo/yr
TOTAL RECOMMENDED $70,632 $72,780 $41,787
1,031,796
kWh
$28,845
-
kW-mo/yr
TOTAL IMPLEMENTED $4,008 - $1,728
42,675
kWh
$2,280
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs