681
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AS0515 #01 Y:2021 | 01 | 2021 | Increase amount of waste recovered for resale | $125,792 | $20,098 | |
| UA0230 #06 Y:2020 | 06 | 2020 | Utilize energy-efficient belts and other improved mechanisms | $116 | $100 | |
| UA0230 #05 Y:2020 | 05 | 2020 | Install occupancy sensors | $546 | $546 | |
| UA0230 #04 Y:2020 | 04 | 2020 | Lower temperature during the winter season and vice-versa | $229 | $50 | |
| UA0230 #03 Y:2020 | 03 | 2020 | Reduce space conditioning during non-working hours | $928 | $221 | |
| UA0230 #02 Y:2020 | 02 | 2020 | Reduce the pressure of compressed air to the minimum required | $1,204 | $50 | |
| UA0230 #01 Y:2020 | 01 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,808 | $1,868 | |
| OR0728 #04 Y:2019 | 04 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $4,008 | - | |
| OR0728 #03 Y:2019 | 03 | 2019 | Use or replace with energy efficient substitutes | $8,174 | $4,152 | |
| OR0728 #02 Y:2019 | 02 | 2019 | Install motor voltage controller on lightly loaded motors | $29,427 | $34,054 | |
| OR0728 #01 Y:2019 | 01 | 2019 | Reduce the pressure of compressed air to the minimum required | $29,023 | $34,574 | |
| OR0727 #04 Y:2019 | 04 | 2019 | Use or replace with energy efficient substitutes | $1,255 | $770 | |
| OR0727 #03 Y:2019 | 03 | 2019 | Reduce the pressure of compressed air to the minimum required | $6,870 | $19,006 | |
| OR0727 #02 Y:2019 | 02 | 2019 | Adjust / maintain fork lift trucks for most efficient operation | $125,609 | $904,500 | |
| OR0727 #01 Y:2019 | 01 | 2019 | Add equipment/ operators to reduce production bottleneck | $2,245,906 | $300,000 | |
| IP0120 #09 Y:2019 | 09 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $691 | $3,215 | |
| IP0120 #08 Y:2019 | 08 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $4,278 | $7,549 | |
| IP0120 #07 Y:2019 | 07 | 2019 | Utilize higher efficiency lamps and/or ballasts | $4,019 | $4,963 | |
| IP0120 #06 Y:2019 | 06 | 2019 | Optimize plant power factor | $9,284 | $11,128 | |
| IP0120 #05 Y:2019 | 05 | 2019 | Lower temperature during the winter season and vice-versa | $473 | $256 |