ITAC Assessment: AS0515
ITAC logo
ITAC Assessment: AS0515
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Residential Framing
NAICS 321214: Truss Manufacturing
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 394
Plant Area 208,077
ft2
Annual Production 2,800
units
Production Hrs. Annual 8,472
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,738 927,840
kWh
Electricity Demand $14,207 3,305
kW-mo/yr
Electricity Fees $8,977 -
Fuel Oil #1 $288,488 11,931
MMBtu
TOTAL YEARLY COSTS $383,410
RECOMMENDED SAVINGS* $234,949 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $183,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #1 Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 3.5313: Increase amount of waste recovered for resale $125,792 $20,098 $(-40,380.0)
(-521,028)
kWh
$(-3,070.0)
-
kW-mo/yr
- - $(-412,502.0) - - $581,744
02 2.1321: Replace fossil fuel equipment with electrical equipment $30,224 $146,764 $(-11,236.0)
(-144,978)
kWh
- - $41,460
-
MMBtu
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,340 $9,935 $19,225
248,065
kWh
$2,115
-
kW-mo/yr
- - - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $18,528 $28,033 $18,317
236,354
kWh
$861
-
kW-mo/yr
- - - $(-650.0) - -
05 2.9114: Use solar heat to make electricty $6,571 $72,520 $5,963
77,150
kWh
$608
-
kW-mo/yr
- - - - - -
06 2.8121: Apply for tax-free status for energy purchases $27,420 $500 - - $5,484 - - - $21,936 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,242 $7,928 $3,014
38,886
kWh
$228
-
kW-mo/yr
- - - - - -
08 2.7135: Install occupancy sensors $1,832 $3,388 $1,832
23,634
kWh
- - - - - - -
TOTAL RECOMMENDED $234,949 $289,166 $(-3,265.0)
(-41,917)
kWh
$742
-
kW-mo/yr
$5,484 $41,460
-
MMBtu
$(-412,502.0) $(-650.0) $21,936 $581,744
TOTAL IMPLEMENTED $183,385 $132,467 $(-11,254.0)
(-145,004)
kWh
$(-1,373.0)
-
kW-mo/yr
$5,484 - $(-412,502.0) $(-650.0) $21,936 $581,744
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #1 Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs