519
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SF0450 #04 Y:2014 | 04 | 2014 | Use / purchase optimum sized compressor | $30,675 | $77,383 | |
| SF0450 #03 Y:2014 | 03 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $29,874 | $19,111 | |
| SF0450 #02 Y:2014 | 02 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,693 | $650 | |
| SF0450 #01 Y:2014 | 01 | 2014 | Reduce space conditioning during non-working hours | $6,757 | - | |
| LE0358 #09 Y:2013 | 09 | 2013 | Replace existing hvac unit with high efficiency model | $1,575 | $16,800 | |
| LE0358 #08 Y:2013 | 08 | 2013 | Utilize higher efficiency lamps and/or ballasts | $24,919 | $31,422 | |
| LE0358 #07 Y:2013 | 07 | 2013 | Use fossil fuel powered generator during peak demand periods | $71,337 | $190,000 | |
| LE0358 #06 Y:2013 | 06 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $6,165 | $21,900 | |
| LE0358 #05 Y:2013 | 05 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $911 | $1,000 | |
| LE0358 #04 Y:2013 | 04 | 2013 | Preheat combustion air with waste heat | $6,817 | $10,056 | |
| LE0358 #03 Y:2013 | 03 | 2013 | Utilize higher efficiency lamps and/or ballasts | $1,699 | $7,698 | |
| LE0358 #02 Y:2013 | 02 | 2013 | Utilize higher efficiency lamps and/or ballasts | $40,049 | $56,100 | |
| LE0358 #01 Y:2013 | 01 | 2013 | Reschedule plant operations or reduce load to avoid peaks | $3,256 | $3,010 | |
| SF0416 #04 Y:2012 | 04 | 2012 | Utilize higher efficiency lamps and/or ballasts | $4,614 | $18,273 | |
| SF0416 #03 Y:2012 | 03 | 2012 | Size electric motors for peak operating efficiency | $1,287 | $2,705 | |
| SF0416 #02 Y:2012 | 02 | 2012 | Combine utility meters | $2,336 | $1,600 | |
| SF0416 #01 Y:2012 | 01 | 2012 | Reduce space conditioning during non-working hours | $2,478 | - | |
| UW0050 #01 Y:2011 | 01 | 2011 | Pay bills on time to avoid late fees | $0.0 | - | |
| UW0049 #04 Y:2011 | 04 | 2011 | Insulate bare equipment | $1,029 | $1,810 | |
| UW0049 #03 Y:2011 | 03 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,756 | $1,300 |