ITAC Assessment: SF0450
ITAC logo
ITAC Assessment: SF0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 305,000
ft2
Annual Production 4,800,000
pieces
Production Hrs. Annual 3,783
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,376 1,514,918
kWh
Electricity Demand $110,453 4,947
kW-mo/yr
Electricity Fees $7,960 -
Natural Gas $31,803 3,947
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7224: Reduce space conditioning during non-working hours $6,757 - $735
7,241
kWh
- $6,022
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,693 $650 $2,693
26,517
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,874 $19,111 $29,874
294,176
kWh
- - -
04 2.4226: Use / purchase optimum sized compressor $30,675 $77,383 $8,885
87,493
kWh
$7,340
-
kW-mo/yr
- $14,450
05 2.6212: Turn off equipment during breaks, reduce operating time $5,062 $12,000 $4,085
40,224
kWh
$977
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $2,563 $11,811 $1,516
14,929
kWh
$1,047
-
kW-mo/yr
- -
TOTAL RECOMMENDED $77,624 $120,955 $47,788
470,580
kWh
$9,364
-
kW-mo/yr
$6,022
-
MMBtu
$14,450
TOTAL IMPLEMENTED $12,013 $12,461 $4,944
48,687
kWh
$1,047
-
kW-mo/yr
$6,022
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs