ITAC Assessment: OK0258
ITAC logo
ITAC Assessment: OK0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CORRUGATED PACKAGING
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 126
Plant Area
n/a
Annual Production 551
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,584 3,796,014
kWh
Natural Gas $154,394 51,429
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,333

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $93 $80 $93
2,345
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,747 $25,520 $5,147
140,973
kWh
- $3,600
03 2.2511: Insulate bare equipment $210 $184 - $210
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $1,386 $585 - $1,386
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $589 $650 - $589
-
MMBtu
-
06 2.3212: Optimize plant power factor $432 $1,100 $432
-
kWh
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $11,493 - - $11,493
-
MMBtu
-
TOTAL RECOMMENDED $22,950 $28,119 $5,672
143,318
kWh
$13,678
-
MMBtu
$3,600
TOTAL IMPLEMENTED $20,333 $25,600 $5,240
143,318
kWh
$11,493
-
MMBtu
$3,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs