ITAC Assessment: UW0049
ITAC logo
ITAC Assessment: UW0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 180,000
ft2
Annual Production 500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,862 3,478,116
kWh
Electricity Demand $31,925 8,021
kW-mo/yr
Natural Gas $28,228 3,926
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,199

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,931 $67,308 $13,787
231,715
kWh
$3,144
-
kW-mo/yr
-
02 2.2625: Chill water to the highest temperature possible $9,443 $7,200 $9,443
158,706
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,756 $1,300 $3,485
56,885
kWh
$271
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $1,029 $1,810 - - $1,029
-
MMBtu
TOTAL RECOMMENDED $31,159 $77,618 $26,715
447,306
kWh
$3,415
-
kW-mo/yr
$1,029
-
MMBtu
TOTAL IMPLEMENTED $13,199 $8,500 $12,928
215,591
kWh
$271
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs