ITAC Assessment: LE0358
ITAC logo
ITAC Assessment: LE0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Wine and Grape Juice
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 184,000
ft2
Annual Production 5,500
Tgal
Production Hrs. Annual 3,600
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,823 1,979,309
kWh
Electricity Demand $59,762 9,694
kW-mo/yr
Electricity Fees $46,511 -
Natural Gas $141,707 21,541
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $156,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $97,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,256 $3,010 - $3,256
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $40,049 $56,100 $21,887
841,801
kWh
$17,094
-
kW-mo/yr
- - $1,068
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,699 $7,698 $487
18,731
kWh
$62
-
kW-mo/yr
- - $1,150
04 2.2442: Preheat combustion air with waste heat $6,817 $10,056 - - $6,817
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $911 $1,000 $511
19,647
kWh
$400
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,165 $21,900 $3,461
133,110
kWh
$2,704
-
kW-mo/yr
- - -
07 2.3192: Use fossil fuel powered generator during peak demand periods $71,337 $190,000 - - - $71,337 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $24,919 $31,422 $13,991
538,138
kWh
$10,928
-
kW-mo/yr
- - -
09 2.7232: Replace existing hvac unit with high efficiency model $1,575 $16,800 $1,168
44,928
kWh
$407
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $156,728 $337,986 $41,505
1,596,355
kWh
$34,851
-
kW-mo/yr
$6,817
-
MMBtu
$71,337 $2,218
TOTAL IMPLEMENTED $97,831 $238,222 $15,159
583,066
kWh
$11,335
-
kW-mo/yr
- $71,337 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs