ITAC Assessment: DS0051
ITAC logo
ITAC Assessment: DS0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plating Metal Parts
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 37
Plant Area 19,652
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 2,470
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,128 843,200
kWh
Electricity Demand $11,088 3,036
kW-mo/yr
Electricity Fees $377 -
Natural Gas $11,801 3,565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $305 $1,149 $200
5,275
kWh
$105
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $1,084 $3,765 $647
17,585
kWh
$437
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $1,434 $1,257 $1,434
38,687
kWh
- -
04 3.4113: Treat and reuse rinse waters $8,506 $17,190 $(-239.0)
(-6,448)
kWh
$(-145.0)
-
kW-mo/yr
$8,890
-
Tgal
TOTAL RECOMMENDED $11,329 $23,361 $2,042
55,099
kWh
$397
-
kW-mo/yr
$8,890
-
Tgal
TOTAL IMPLEMENTED $9,940 $18,447 $1,195
32,239
kWh
$(-145.0)
-
kW-mo/yr
$8,890
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs