Assessment Year | 1998 |
---|---|
Principal Product | coffee brewers |
NAICS |
n/a
|
SIC | 3634: Electric Housewares and Fans |
Sales Range | $50 M to 100M |
# of Employees | 450 |
Plant Area |
170,000
ft2
|
Annual Production | 300,000
pieces
|
Production Hrs. Annual | 2,034
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,407 | 1,948,124 |
kWh
|
$0.023 |
Electricity Demand | $38,073 | 6,600 |
kW-mo/yr
|
$5.77 |
Natural Gas | $19,033 | 4,968 |
MMBtu
|
$3.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $533,047 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $113,349 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.446: Automate finishing process | $242,896 | $180,000 | - | - | $210,000 | $20,800 | $12,096 | |
02 | 4.441: Install automatic packing equipment | $75,000 | $66,000 | - | - | $75,000 | - | - | |
03 | 4.446: Automate finishing process | $68,064 | $11,000 | - | - | $60,000 | - | $8,064 | |
04 | 4.321: Optimize production lot sizes and inventories | $83,349 | - | - | - | $83,349 | - | - | |
05 | 4.111: Add equipment/ operators to reduce production bottleneck | $30,000 | $30,000 | - | - | $30,000 | - | - | |
06 | 4.425: Eliminate/reduce redundant inspections | $30,000 | $900 | - | - | $30,000 | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,396 | $3,048 |
$1,402
60,082
kWh
|
$994
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $869 | $2,080 |
$509
21,981
kWh
|
$360
-
kW-mo/yr
|
- | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $473 | $15 |
$277
12,016
kWh
|
$196
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $533,047 | $293,043 |
$2,188
94,079
kWh
|
$1,550
-
kW-mo/yr
|
$488,349 | $20,800 | $20,160 | ||
TOTAL IMPLEMENTED | $113,349 | $900 | - | - | $113,349 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs