ITAC Assessment: UA0125
ITAC logo
ITAC Assessment: UA0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 43
Plant Area 34,670
ft2
Annual Production 14,000
thousand feet
Production Hrs. Annual 2,142
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,073 1,881,393
kWh
Electricity Fees $13,037 -
Wood $95,721 83,966
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,933 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,736

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.2136: Install / repair insulation on steam lines $1,874 $2,437 - $1,874
-
MMBtu
02 2.2121: Increase amount of condensate returned $1,954 $2,500 - $1,954
-
MMBtu
03 2.1113: Reduce combustion air flow to optimum $2,753 $7,500 - $2,753
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,029 $6,195 $5,029
47,354
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,600 $4,720 $3,600
33,914
kWh
-
06 2.7261: Install timers and/or thermostats $1,635 $360 $1,635
15,409
kWh
-
07 2.7134: Use photocell controls $88 $192 $88
830
kWh
-
TOTAL RECOMMENDED $16,933 $23,904 $10,352
97,507
kWh
$6,581
-
MMBtu
TOTAL IMPLEMENTED $9,736 $16,195 $5,029
47,354
kWh
$4,707
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs