2,259
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0682 #02 Y:2016 | 02 | 2016 | Replace boiler | $4,289 | $23,625 | |
| OR0682 #01 Y:2016 | 01 | 2016 | Add equipment/ operators to reduce production bottleneck | $104,297 | $70,000 | |
| SF0494 #07 Y:2016 | 07 | 2016 | Use solar heat to make electricty | $50,748 | $406,834 | |
| SF0494 #06 Y:2016 | 06 | 2016 | Install occupancy sensors | $567 | $2,381 | |
| SF0494 #05 Y:2016 | 05 | 2016 | Modify refrigeration system to operate at a lower pressure | $1,493 | $5,050 | |
| SF0494 #04 Y:2016 | 04 | 2016 | Utilize higher efficiency lamps and/or ballasts | $2,469 | $4,948 | |
| SF0494 #03 Y:2016 | 03 | 2016 | Install / repair insulation on steam lines | $5,772 | $2,510 | |
| SF0494 #02 Y:2016 | 02 | 2016 | Reduce the pressure of compressed air to the minimum required | $270 | - | |
| SF0494 #01 Y:2016 | 01 | 2016 | Recharge batteries on during off-peak demand periods | $2,238 | - | |
| OR0678 #03 Y:2016 | 03 | 2016 | Insulate bare equipment | $972 | $2,626 | |
| OR0678 #02 Y:2016 | 02 | 2016 | Turn off equipment when not in use | $1,663 | $247 | |
| OR0678 #01 Y:2016 | 01 | 2016 | Improve combustion control capability | $4,885 | $2,948 | |
| SF0491 #04 Y:2016 | 04 | 2016 | Utilize higher efficiency lamps and/or ballasts | $23,425 | $15,337 | |
| SF0491 #03 Y:2016 | 03 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $17,740 | $6,235 | |
| SF0491 #02 Y:2016 | 02 | 2016 | Eliminate or reduce compressed air usage | $25,960 | $7,975 | |
| SF0491 #01 Y:2016 | 01 | 2016 | Modify refrigeration system to operate at a lower pressure | $9,190 | $300 | |
| MI0302 #10 Y:2016 | 10 | 2016 | Close holes and openings in building such as broken windows | $521 | $116 | |
| MI0302 #09 Y:2016 | 09 | 2016 | Air condition only space necessary | $1,008 | $160 | |
| MI0302 #08 Y:2016 | 08 | 2016 | Install vinyl strip / high speed / air curtain doors | $1,335 | $416 | |
| MI0302 #07 Y:2016 | 07 | 2016 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $2,023 | $3,200 |