Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Craft Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 45,000
ft2
Annual Production 110,000
bbl
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,905 2,211,440
kWh
Electricity Demand $52,032 7,003
kW-mo/yr
Electricity Fees $3,083 -
Natural Gas $208,517 27,219
MMBtu
Waste Disposal Costs
Water Usage $244,877 31,608
Tgal
TOTAL YEARLY COSTS $646,415
RECOMMENDED SAVINGS* $7,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1116: Improve combustion control capability $4,885 $2,948 $4,199
67,328
kWh
$686
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $1,663 $247 $1,663
26,674
kWh
- -
03 2.2511: Insulate bare equipment $972 $2,626 - - $972
-
MMBtu
TOTAL RECOMMENDED $7,520 $5,821 $5,862
94,002
kWh
$686
-
kW-mo/yr
$972
-
MMBtu
TOTAL IMPLEMENTED $2,635 $2,873 $1,663
26,674
kWh
- $972
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs