Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 80,000
ft2
Annual Production 450,000
units
Production Hrs. Annual 4,216
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,628 697,536
kWh
LPG $15,879 1,739
MMBtu
TOTAL YEARLY COSTS $145,507
RECOMMENDED SAVINGS* $76,315 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,425

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $9,190 $300 $9,190
30,772
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $25,960 $7,975 $25,960
86,922
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,740 $6,235 $17,740
59,400
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $23,425 $15,337 $20,714
69,158
kWh
$1,371 $1,340
TOTAL RECOMMENDED $76,315 $29,847 $73,604
246,252
kWh
$1,371 $1,340
TOTAL IMPLEMENTED $23,425 $15,337 $20,714
69,158
kWh
$1,371 $1,340
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs