ITAC Assessment: CI0006
ITAC logo
ITAC Assessment: CI0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Metal Finishing
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 170,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $924,829 7,545,402
kWh
Electricity Demand $135,770 10,185
kW-mo/yr
Natural Gas $514,322 58,422
MMBtu
LPG $33,825 3,000
MMBtu
Waste Disposal Costs
Water Usage $104,255 15,751
Tgal
TOTAL YEARLY COSTS $1,713,001
RECOMMENDED SAVINGS* $112,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $28,328 $32,800 $28,328
231,104
kWh
- - -
02 2.8227: Adjust / maintain fork lift trucks for most efficient operation $26,391 $90,000 $(-7,434.0)
(-60,653)
kWh
- - $33,825
-
MMBtu
03 2.2437: Recover waste heat from equipment $22,728 $6,000 $16,330
133,230
kWh
$6,398
-
kW-mo/yr
- -
04 2.9114: Use solar heat to make electricty $14,859 $82,655 $7,469
60,938
kWh
$7,390
-
kW-mo/yr
- -
05 2.1224: Replace boiler $13,563 $27,000 $(-25,698.0)
(-209,664)
kWh
$(-1,074.0)
-
kW-mo/yr
$40,335
-
MMBtu
-
06 2.4239: Eliminate or reduce compressed air usage $4,279 $500 $4,279
34,913
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,588 $1,342 $2,140
17,459
kWh
$448
-
kW-mo/yr
- -
TOTAL RECOMMENDED $112,736 $240,297 $25,414
207,327
kWh
$13,162
-
kW-mo/yr
$40,335
-
MMBtu
$33,825
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs