Assessment Year | 2023 |
---|---|
Principal Product | Metal Finishing |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
170,000
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $924,829 | 7,545,402 |
kWh
|
$0.12 | |
Electricity Demand | $135,770 | 10,185 |
kW-mo/yr
|
$13.33 | |
Natural Gas | $514,322 | 58,422 |
MMBtu
|
$8.80 | |
LPG | $33,825 | 3,000 |
MMBtu
|
$11.28 | |
Waste Disposal Costs | |||||
Water Usage | $104,255 | 15,751 |
Tgal
|
$6.62 | |
TOTAL YEARLY COSTS | $1,713,001 | ||||
RECOMMENDED SAVINGS* | $112,736 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $28,328 | $32,800 |
$28,328
231,104
kWh
|
- | - | - | |
02 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $26,391 | $90,000 |
$(-7,434.0)
(-60,653)
kWh
|
- | - |
$33,825
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $22,728 | $6,000 |
$16,330
133,230
kWh
|
$6,398
-
kW-mo/yr
|
- | - | |
04 | 2.9114: Use solar heat to make electricty | $14,859 | $82,655 |
$7,469
60,938
kWh
|
$7,390
-
kW-mo/yr
|
- | - | |
05 | 2.1224: Replace boiler | $13,563 | $27,000 |
$(-25,698.0)
(-209,664)
kWh
|
$(-1,074.0)
-
kW-mo/yr
|
$40,335
-
MMBtu
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $4,279 | $500 |
$4,279
34,913
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,588 | $1,342 |
$2,140
17,459
kWh
|
$448
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $112,736 | $240,297 |
$25,414
207,327
kWh
|
$13,162
-
kW-mo/yr
|
$40,335
-
MMBtu
|
$33,825
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs