Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,259

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Beverage manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0328 #01 Y:2022 Replace existing chiller with high efficiency model $57,088 $235,000
OK1072 #05 Y:2022 Use solar heat to make electricty $265,528 $1,357,737
OK1072 #04 Y:2022 Install sub-metering equipment $173,223 $1,272
OK1072 #03 Y:2022 Optimize plant power factor $439 $2,000
OK1072 #02 Y:2022 Analyze flue gas for proper air/fuel ratio $6,749 -
OK1072 #01 Y:2022 Eliminate or reduce compressed air usage $3,650 -
AM0847 #09 Y:2022 Eliminate or reduce compressed air usage $255 $50
AM0847 #08 Y:2022 Use photocell controls $330 $110
AM0847 #07 Y:2022 Install occupancy sensors $355 $232
AM0847 #06 Y:2022 Use synthetic lubricant $506 $220
AM0847 #05 Y:2022 Utilize energy-efficient belts and other improved mechanisms $725 $68
AM0847 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $840 $10
AM0847 #03 Y:2022 Optimize plant power factor $1,420 $2,240
AM0847 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $3,340 $1,000
AM0847 #01 Y:2022 Apply for tax-free status for energy purchases $55,740 $5,500
OR0753 #03 Y:2022 Use solar heat to make electricty $14,927 $278,534
OR0753 #02 Y:2022 Replace fossil fuel equipment with electrical equipment $9,938 $40,624
OR0753 #01 Y:2022 Modify current incentive program $1,000 -
LE0520 #04 Y:2022 Use most efficient type of electric motors $7,958 $50,000
LE0520 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $1,247 $4,450