ITAC Assessment: MZ0328
ITAC logo
ITAC Assessment: MZ0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product wines
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 27
Plant Area 100,176
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,945 1,706,250
kWh
Natural Gas $33,882 2,165
MMBtu
Waste Disposal Costs
Water Usage $15,813 3,970
Tgal
TOTAL YEARLY COSTS $203,640
RECOMMENDED SAVINGS* $60,875 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2622: Replace existing chiller with high efficiency model $57,088 $235,000 $57,088
634,312
kWh
-
02 2.2437: Recover waste heat from equipment $2,047 $7,500 - $2,047
-
MMBtu
03 2.7135: Install occupancy sensors $1,438 $2,450 $1,438
15,985
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $302 $120 $302
3,356
kWh
-
TOTAL RECOMMENDED $60,875 $245,070 $58,828
653,653
kWh
$2,047
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs