ITAC Assessment: OR0753
ITAC logo
ITAC Assessment: OR0753
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Whiskey, Flavored Vodka and Gin
NAICS 312140: Distilleries
SIC 2085: Distilled and Blended Liquors
Sales Range $5
M
to 10
M
# of Employees 38
Plant Area 32,500
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 3,570
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,356 302,154
kWh
Electricity Demand $5,096 911
kW-mo/yr
Electricity Fees $2,058 -
LPG $44,355 1,624
MMBtu
Waste Disposal Costs
Water Usage $21,400 254,000
Tgal
Other Liquid (haz) $38,036 103,800
gal
Solid Waste (non-haz) $7,711 21,450
lb
TOTAL YEARLY COSTS $135,012
RECOMMENDED SAVINGS* $25,865 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
01 4.421: Modify current incentive program $1,000 - - - - $1,000
02 2.1321: Replace fossil fuel equipment with electrical equipment $9,938 $40,624 $(-15,274.0)
(-308,569)
kWh
$(-11,472.0)
-
kW-mo/yr
$36,684
-
MMBtu
-
03 2.9114: Use solar heat to make electricty $14,927 $278,534 $14,927
301,551
kWh
- - -
TOTAL RECOMMENDED $25,865 $319,158 $(-347.0)
(-7,018)
kWh
$(-11,472.0)
-
kW-mo/yr
$36,684
-
MMBtu
$1,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs