ITAC Assessment: WI0029
ITAC logo
ITAC Assessment: WI0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product AIR-COOLED ENGINES
NAICS
n/a
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 22,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,863 3,711,606
kWh
Natural Gas $177,844 36,328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,795

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $3,047 - $3,047
49,824
kWh
- -
02 2.3132: Recharge batteries on during off-peak demand periods $5,565 - $5,565
-
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,218 $1,926 $2,218
26,377
kWh
- -
04 2.7226: Use computer programs to optimize hvac performance $1,933 $5,000 $1,933
31,653
kWh
- -
05 2.2437: Recover waste heat from equipment $1,461 $1,400 - $1,461
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $2,571 $500 - $2,671
-
MMBtu
$(-100.0)
TOTAL RECOMMENDED $16,795 $8,826 $12,763
107,854
kWh
$4,132
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $16,795 $8,826 $12,763
107,854
kWh
$4,132
-
MMBtu
$(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs