ITAC Assessment: OK1072
ITAC logo
ITAC Assessment: OK1072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Bottled tea and lemonade
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 167
Plant Area 100,000
ft2
Annual Production 907
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $394,056 4,925,700
kWh
Natural Gas $84,606 9,277
MMBtu
Waste Disposal Costs
Water Usage $185,215 54,960
Tgal
Water Disposal $288,254 48,203
Tgal
TOTAL YEARLY COSTS $952,131
RECOMMENDED SAVINGS* $449,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $3,650 - $3,650
45,619
kWh
- - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $6,749 - - - $6,749
-
MMBtu
-
03 2.3212: Optimize plant power factor $439 $2,000 - $439 - -
04 2.8117: Install sub-metering equipment $173,223 $1,272 - - - $173,223
05 2.9114: Use solar heat to make electricty $265,528 $1,357,737 $265,528
3,319,098
kWh
- - -
TOTAL RECOMMENDED $449,589 $1,361,009 $269,178
3,364,717
kWh
$439 $6,749
-
MMBtu
$173,223
TOTAL IMPLEMENTED $3,650 - $3,650
45,619
kWh
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs