ITAC Assessment: AM0202
ITAC logo
ITAC Assessment: AM0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Industrial gass turbine generator sets
NAICS
n/a
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 65,000
ft2
Annual Production 18
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,780 1,714,537
kWh
Natural Gas $32,152 6,352
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,621 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $36,010 - $36,010
-
kWh
-
02 2.3212: Optimize plant power factor $5,643 $21,675 $5,643
-
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $915 $100 $915
18,757
kWh
-
04 2.8123: Pay utility bills on time $608 - - $608
05 2.4314: Use synthetic lubricant $445 - $445
-
kWh
-
TOTAL RECOMMENDED $43,621 $21,775 $43,013
18,757
kWh
$608
TOTAL IMPLEMENTED $7,003 $21,775 $7,003
18,757
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs