ITAC Assessment: MA0397
ITAC logo
ITAC Assessment: MA0397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Preforated Components
NAICS
n/a
SIC 3649:
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 114,700
ft2
Annual Production 160,000,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Demand $100,062 5,469
kW-mo/yr
Natural Gas $40,063 5,676
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,779 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,492

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,044 $600 $5,044
82,356
kWh
- - -
02 2.8113: Purchase gas directly from a contract gas supplier $3,025 $200 - - - $3,025
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,200 - $1,200
19,050
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $874 $681 $874
13,775
kWh
- - -
05 2.6218: Turn off equipment when not in use $790 $404 - - $790
-
MMBtu
-
06 2.7131: Add area lighting switches $413 $60 $335
5,275
kWh
$78
-
kW-mo/yr
- -
07 4.821: Pay bills on time to avoid late fees $433 - - - - $433
TOTAL RECOMMENDED $11,779 $1,945 $7,453
120,456
kWh
$78
-
kW-mo/yr
$790
-
MMBtu
$3,458
TOTAL IMPLEMENTED $10,492 $1,204 $6,244
101,406
kWh
- $790
-
MMBtu
$3,458
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs