Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

308

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Seafood product preparation and packaging
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2319 #04 Y:2023 Install vinyl strip / high speed / air curtain doors $307 $230
LS2319 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $2,512 $1,365
LS2319 #02 Y:2023 Install timers and/or thermostats $291 $50
LS2319 #01 Y:2023 Use a different or recycled raw material $12,150 -
TR0046 #03 Y:2023 Insulate bare equipment $18,016 $363
TR0046 #02 Y:2023 Use solar heat to make electricty $15,878 $349,862
TR0046 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,685 $4,255
MI0409 #07 Y:2022 Utilize higher efficiency lamps and/or ballasts $222 $363
MI0409 #06 Y:2022 Install occupancy sensors $235 $700
MI0409 #05 Y:2022 Install vinyl strip / high speed / air curtain doors $1,094 $1,885
MI0409 #04 Y:2022 Replace existing hvac unit with high efficiency model $1,496 $240
MI0409 #03 Y:2022 Install equipment (eg compactor) to reduce disposal costs $3,003 $14,690
MI0409 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $19,919 $1,980
MI0409 #01 Y:2022 Use solar heat to heat water $24,802 $108,191
MS0402 #03 Y:2022 Insulate bare equipment $1,180 $2,290
MS0402 #02 Y:2022 Use most efficient type of electric motors $7,486 $20,845
MS0402 #01 Y:2022 Optimize plant power factor $1,171 $3,039
OR0742 #04 Y:2021 Recharge batteries on during off-peak demand periods $10,200 $38,018
OR0742 #03 Y:2021 Utilize controls to operate equipment only when needed $8,662 $6,857
OR0742 #02 Y:2021 Redesign process $3,895 -