ITAC Assessment: MS0402
ITAC logo
ITAC Assessment: MS0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Catfish
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $100
M
to 500
M
# of Employees 273
Plant Area 120,660
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 3,963
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $584,052 10,688,139
kWh
Electricity Demand $129,400 27,680
kW-mo/yr
Electricity Fees $136,006 -
Natural Gas $37,123 3,465
MMBtu
TOTAL YEARLY COSTS $886,580
RECOMMENDED SAVINGS* $9,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $1,171 $3,039 - - $1,171
02 2.4133: Use most efficient type of electric motors $7,486 $20,845 $7,414
135,783
kWh
$72
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $1,180 $2,290 $1,180
21,615
kWh
- -
TOTAL RECOMMENDED $9,837 $26,174 $8,594
157,398
kWh
$72
-
kW-mo/yr
$1,171
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs