ITAC Assessment: WI0128
ITAC logo
ITAC Assessment: WI0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PRINTING
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 5,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,837 776,378
kWh
Natural Gas $5,205 924
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,291 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,291

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,060 - $1,060
14,947
kWh
-
02 2.7261: Install timers and/or thermostats $704 $600 - $704
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $755 - - $755
-
MMBtu
04 2.7226: Use computer programs to optimize hvac performance $704 $2,800 $704
9,965
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $633 $144 $633
9,086
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $331 $700 - $331
-
MMBtu
07 2.2437: Recover waste heat from equipment $104 $500 - $104
-
MMBtu
TOTAL RECOMMENDED $4,291 $4,744 $2,397
33,998
kWh
$1,894
-
MMBtu
TOTAL IMPLEMENTED $4,291 $4,744 $2,397
33,998
kWh
$1,894
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs