ITAC Assessment: OR0742
ITAC logo
ITAC Assessment: OR0742
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Seafood Products
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $5
M
to 10
M
# of Employees 250
Plant Area 51,888
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 5,304
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,281 2,149,080
kWh
Electricity Demand $21,745 4,582
kW-mo/yr
Electricity Fees $18,664 -
Natural Gas $13,408 1,613
MMBtu
Waste Disposal Costs
Water Usage $52,573 13,531
Tgal
TOTAL YEARLY COSTS $249,671
RECOMMENDED SAVINGS* $26,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,905

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $4,010 - $4,010
57,098
kWh
- - -
02 2.5194: Redesign process $3,895 - $35
493
kWh
- $3,465 $395
03 2.6231: Utilize controls to operate equipment only when needed $8,662 $6,857 $357
5,089
kWh
$8,305
-
Tgal
- -
04 2.3132: Recharge batteries on during off-peak demand periods $10,200 $38,018 - - - $10,200
TOTAL RECOMMENDED $26,767 $44,875 $4,402
62,680
kWh
$8,305
-
Tgal
$3,465 $10,595
TOTAL IMPLEMENTED $7,905 - $4,045
57,591
kWh
- $3,465 $395
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs