ITAC Assessment: UU0024
ITAC logo
ITAC Assessment: UU0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Window Blinds
NAICS
n/a
SIC 2591: Drapery Hardware and Window Blinds and Shades
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 59,000
ft2
Annual Production 38,000,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,565 1,381,929
kWh
Electricity Demand $20,750 2,788
kW-mo/yr
Electricity Fees $9,817 -
Natural Gas $16,902 2,306
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $277,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $108,531

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,471 $30 $1,042
34,600
kWh
$429
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,823 $23,536 $5,605
185,989
kWh
$3,218
-
kW-mo/yr
- - - -
03 2.2437: Recover waste heat from equipment $2,165 $1,441 - - $2,165
-
MMBtu
- - -
04 3.5313: Increase amount of waste recovered for resale $9,256 $4,600 - - - $9,256
-
lb
- -
05 3.5316: Contract a wood pallet recycling company $1,020 - - - - $1,020
-
lb
- -
06 4.213: Purchase material from supplier in customized packaging $36,029 - - - - - $36,029 -
07 4.132: Purchase new equipment to reduce material use / cost $159,659 $61,750 - - - - - $159,659
08 4.513: Re-arrange equipment layout to reduce labor costs $58,590 $720 - - - - $58,590 -
TOTAL RECOMMENDED $277,013 $92,077 $6,647
220,589
kWh
$3,647
-
kW-mo/yr
$2,165
-
MMBtu
$10,276
-
lb
$94,619 $159,659
TOTAL IMPLEMENTED $108,531 $6,791 $1,042
34,600
kWh
$429
-
kW-mo/yr
$2,165
-
MMBtu
$10,276
-
lb
$94,619 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs