Assessment Year | 1995 |
---|---|
Principal Product | Data tape recorders |
NAICS |
n/a
|
SIC | 3572: Computer Storage Devices |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
104,000
ft2
|
Annual Production | 600
pieces
|
Production Hrs. Annual | 2,430
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $243,425 | 4,724,209 |
kWh
|
$0.052 |
Natural Gas | $31,828 | 8,928 |
MMBtu
|
$3.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,180 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,040 | $1,990 |
$3,040
68,288
kWh
|
- | - | - | |
02 | 2.7229: Air condition only space necessary | $3,580 | $400 |
$1,300
29,308
kWh
|
$2,280
-
MMBtu
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,350 | $3,820 |
$2,350
53,927
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,090 | $3,670 |
$1,090
18,757
kWh
|
- | - | - | |
05 | 3.8132: Use less toxic and volatile solvent substitutes | $410 | $1,170 | - | - |
$770
-
gal
|
$(-360.0) | |
06 | 2.4221: Install compressor air intakes in coolest locations | $420 | $300 |
$420
5,275
kWh
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $290 | $130 |
$290
3,517
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $11,180 | $11,480 |
$8,490
179,072
kWh
|
$2,280
-
MMBtu
|
$770
-
gal
|
$(-360.0) | ||
TOTAL IMPLEMENTED | $8,000 | $6,190 |
$5,720
119,870
kWh
|
$2,280
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs