ITAC Assessment: NC0138
ITAC logo
ITAC Assessment: NC0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Contract woven fabrics
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $5
M
to 10
M
# of Employees 32
Plant Area 60,000
ft2
Annual Production 1,500
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,215 2,185,522
kWh
Electricity Demand $36,685 5,605
kW-mo/yr
Electricity Fees $3,850 -
Natural Gas $73,823 13,172
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,701 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,182

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $525 $1,431 $126
14,068
kWh
$399
-
kW-mo/yr
- - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $16,312 - - $18,312
-
kW-mo/yr
- - - $(-2,000.0)
03 2.4323: Use optimum size and capacity equipment $1,915 - $920
34,584
kWh
$995
-
kW-mo/yr
- - - -
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,267 - $462
17,292
kWh
$805
-
kW-mo/yr
- - - -
05 3.4115: Recover and reuse cooling water $1,815 $1,500 - - $1,401
-
MMBtu
$414
-
Tgal
- -
06 3.5313: Increase amount of waste recovered for resale $113 $200 - - - - $113
-
lb
-
07 3.4153: Use counter current rinsing to reduce waste water $754 $2,500 - - $582
-
MMBtu
$172
-
Tgal
- -
TOTAL RECOMMENDED $22,701 $5,631 $1,508
65,944
kWh
$20,511
-
kW-mo/yr
$1,983
-
MMBtu
$586
-
Tgal
$113
-
lb
$(-2,000.0)
TOTAL IMPLEMENTED $3,182 - $1,382
51,876
kWh
$1,800
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs