| Assessment Year | 1998 |
|---|---|
| Principal Product | Contract woven fabrics |
| NAICS |
n/a
|
| SIC | 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk |
| Sales Range | $5 M to 10M |
| # of Employees | 32 |
| Plant Area |
60,000
ft2
|
| Annual Production | 1,500
thousand feet
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $73,215 | 2,185,522 |
kWh
|
$0.034 |
| Electricity Demand | $36,685 | 5,605 |
kW-mo/yr
|
$6.55 |
| Electricity Fees | $3,850 | - |
|
- |
| Natural Gas | $73,823 | 13,172 |
MMBtu
|
$5.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,701 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,182 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $525 | $1,431 |
$126
14,068
kWh
|
$399
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $16,312 | - | - |
$18,312
-
kW-mo/yr
|
- | - | - | $(-2,000.0) | |
| 03 | 2.4323: Use optimum size and capacity equipment | $1,915 | - |
$920
34,584
kWh
|
$995
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $1,267 | - |
$462
17,292
kWh
|
$805
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 3.4115: Recover and reuse cooling water | $1,815 | $1,500 | - | - |
$1,401
-
MMBtu
|
$414
-
Tgal
|
- | - | |
| 06 | 3.5313: Increase amount of waste recovered for resale | $113 | $200 | - | - | - | - |
$113
-
lb
|
- | |
| 07 | 3.4153: Use counter current rinsing to reduce waste water | $754 | $2,500 | - | - |
$582
-
MMBtu
|
$172
-
Tgal
|
- | - | |
| TOTAL RECOMMENDED | $22,701 | $5,631 |
$1,508
65,944
kWh
|
$20,511
-
kW-mo/yr
|
$1,983
-
MMBtu
|
$586
-
Tgal
|
$113
-
lb
|
$(-2,000.0) | ||
| TOTAL IMPLEMENTED | $3,182 | - |
$1,382
51,876
kWh
|
$1,800
-
kW-mo/yr
|
- | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs