Assessment Year | 2001 |
---|---|
Principal Product | Specialty and Technical grades of paper |
NAICS |
n/a
|
SIC | 2621: Paper Mills |
Sales Range | $50 M to 100M |
# of Employees | 190 |
Plant Area |
231,600
ft2
|
Annual Production | 60,000,000
lb
|
Production Hrs. Annual | 8,425
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,324,931 | 18,406,926 |
kWh
|
$0.072 |
Electricity Demand | $353,333 | 39,617 |
kW-mo/yr
|
$8.92 |
Electricity Fees | $62,356 | - |
|
- |
LPG | $87,744 | 12,011 |
MMBtu
|
$7.31 |
Fuel Oil #6 | $1,224,997 | 248,407 |
MMBtu
|
$4.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $419,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,500 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $254,000 | $120,000 | n/a |
$(-18,000.0)
(-251,000)
kWh
|
$(-3,000.0)
-
kW-mo/yr
|
- |
$275,000
-
MMBtu
|
02 | 2.2437: Recover waste heat from equipment | $62,000 | $35,000 | - | - |
$62,000
-
MMBtu
|
- | |
03 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $54,400 | $290,000 | n/a |
$61,400
852,200
kWh
|
$17,000
-
kW-mo/yr
|
- |
$(-24,000.0)
-
MMBtu
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,500 | $9,500 |
$15,500
215,400
kWh
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,300 | $12,000 |
$8,300
115,200
kWh
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,000 | $24,000 |
$12,000
170,000
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,800 | $51,800 |
$4,100
56,400
kWh
|
$700
-
kW-mo/yr
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,700 | - |
$3,700
51,000
kWh
|
- | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,200 | - |
$3,200
44,800
kWh
|
- | - | - | |
10 | 2.2123: Insulate feedwater tank | $2,000 | $3,000 | - | - | - |
$2,000
-
MMBtu
|
|
TOTAL RECOMMENDED | $419,900 | $545,300 |
$90,200
1,254,000
kWh
|
$14,700
-
kW-mo/yr
|
$62,000
-
MMBtu
|
$253,000
-
MMBtu
|
||
TOTAL IMPLEMENTED | $37,500 | $76,300 |
$34,800
482,800
kWh
|
$700
-
kW-mo/yr
|
- |
$2,000
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs