ITAC Assessment: MA0484
ITAC logo
ITAC Assessment: MA0484
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Specialty and Technical grades of paper
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 190
Plant Area 231,600
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 8,425
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,324,931 18,406,926
kWh
Electricity Demand $353,333 39,617
kW-mo/yr
Electricity Fees $62,356 -
LPG $87,744 12,011
MMBtu
Fuel Oil #6 $1,224,997 248,407
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $419,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #6 Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $254,000 $120,000 n/a $(-18,000.0)
(-251,000)
kWh
$(-3,000.0)
-
kW-mo/yr
- $275,000
-
MMBtu
02 2.2437: Recover waste heat from equipment $62,000 $35,000 - - $62,000
-
MMBtu
-
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $54,400 $290,000 n/a $61,400
852,200
kWh
$17,000
-
kW-mo/yr
- $(-24,000.0)
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,500 $9,500 $15,500
215,400
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,300 $12,000 $8,300
115,200
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,000 $24,000 $12,000
170,000
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,800 $51,800 $4,100
56,400
kWh
$700
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,700 - $3,700
51,000
kWh
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $3,200 - $3,200
44,800
kWh
- - -
10 2.2123: Insulate feedwater tank $2,000 $3,000 - - - $2,000
-
MMBtu
TOTAL RECOMMENDED $419,900 $545,300 $90,200
1,254,000
kWh
$14,700
-
kW-mo/yr
$62,000
-
MMBtu
$253,000
-
MMBtu
TOTAL IMPLEMENTED $37,500 $76,300 $34,800
482,800
kWh
$700
-
kW-mo/yr
- $2,000
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs