ITAC Assessment: LS2319
ITAC logo
ITAC Assessment: LS2319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Seafood Product Preparation and Packaging
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2091: Canned and Cured Fish and Seafoods
Sales Range $5
M
to 10
M
# of Employees 114
Plant Area 19,500
ft2
Annual Production 800,000
lb
Production Hrs. Annual 5,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,105 1,761,226
kWh
Waste Disposal Costs
Water Disposal $68,000 1,280
Tgal
Solid Waste (non-haz) $48,600 6,240,000
lb
TOTAL YEARLY COSTS $303,705
RECOMMENDED SAVINGS* $49,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $307

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 3.1175: Use a different or recycled raw material $12,150 - - - $12,150
-
lb
02 2.7261: Install timers and/or thermostats $291 $50 $291
2,750
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,512 $1,365 $2,512
23,708
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $307 $230 $307
2,892
kWh
- -
05 3.3133: Use other waste concentration methods $34,000 $200,000 - $34,000
-
Tgal
-
TOTAL RECOMMENDED $49,260 $201,645 $3,110
29,350
kWh
$34,000
-
Tgal
$12,150
-
lb
TOTAL IMPLEMENTED $307 $230 $307
2,892
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs