ITAC Assessment: TR0046
ITAC logo
ITAC Assessment: TR0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Shrimp & Okra
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 103
Plant Area 110,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 5,880
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $258,619 7,906,000
kWh
Electricity Demand $250,994 28,512
kW-mo/yr
Electricity Fees $61,442 -
TOTAL YEARLY COSTS $571,055
RECOMMENDED SAVINGS* $35,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,685 $4,255 $1,099
36,634
kWh
$586
-
kW-mo/yr
02 2.9114: Use solar heat to make electricty $15,878 $349,862 $10,135
337,829
kWh
$5,743
-
kW-mo/yr
03 2.2511: Insulate bare equipment $18,016 $363 $12,851
428,378
kWh
$5,165
-
kW-mo/yr
TOTAL RECOMMENDED $35,579 $354,479 $24,085
802,841
kWh
$11,494
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs