235
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0290 #04 Y:2009 | 04 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,543 | $750 | |
| LE0290 #03 Y:2009 | 03 | 2009 | Recover waste heat from equipment | $3,929 | $2,000 | |
| LE0290 #02 Y:2009 | 02 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,837 | $15,700 | |
| LE0290 #01 Y:2009 | 01 | 2009 | Install vinyl strip / high speed / air curtain doors | $9,385 | $1,200 | |
| SF0360 #03 Y:2008 | 03 | 2008 | Utilize higher efficiency lamps and/or ballasts | $1,717 | $10,269 | |
| SF0360 #02 Y:2008 | 02 | 2008 | Combine utility meters | $1,439 | $1,210 | |
| SF0360 #01 Y:2008 | 01 | 2008 | Recharge batteries on during off-peak demand periods | $103 | - | |
| UU0095 #05 Y:2005 | 05 | 2005 | Install / repair insulation on steam lines | $7,720 | $450 | |
| UU0095 #04 Y:2005 | 04 | 2005 | Install compressor air intakes in coolest locations | $710 | $305 | |
| UU0095 #03 Y:2005 | 03 | 2005 | Use adjustable frequency drive or multiple speed motors on existing system | $54,985 | $40,000 | |
| UU0095 #02 Y:2005 | 02 | 2005 | Use waste heat from hot flue gases to preheat | $23,800 | $20,000 | |
| UU0095 #01 Y:2005 | 01 | 2005 | Analyze flue gas for proper air/fuel ratio | $4,360 | $2,000 | |
| UU0094 #05 Y:2005 | 05 | 2005 | Use optimum thickness insulation | $110 | $150 | |
| UU0094 #04 Y:2005 | 04 | 2005 | Use demand controller or load shedder | $1,540 | - | |
| UU0094 #03 Y:2005 | 03 | 2005 | Install compressor air intakes in coolest locations | $370 | $220 | |
| UU0094 #02 Y:2005 | 02 | 2005 | Insulate glazing, walls, ceilings, and roofs | $1,260 | $7,000 | |
| UU0094 #01 Y:2005 | 01 | 2005 | Utilize higher efficiency lamps and/or ballasts | $1,140 | $380 | |
| CO0559 #08 Y:2004 | 08 | 2004 | Insulate glazing, walls, ceilings, and roofs | $650 | $4,550 | |
| CO0559 #07 Y:2004 | 07 | 2004 | Utilize higher efficiency lamps and/or ballasts | $572 | $292 | |
| CO0559 #06 Y:2004 | 06 | 2004 | Install occupancy sensors | $1,760 | $2,260 |