ITAC Assessment: UU0094
ITAC logo
ITAC Assessment: UU0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Ice Cream Novelties
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 61,800
ft2
Annual Production 24,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,715 210,680
kWh
Electricity Demand $8,885 884
kW-mo/yr
Natural Gas $16,015 2,678
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,140 $380 $620
23,460
kWh
$520
-
kW-mo/yr
02 2.7491: Insulate glazing, walls, ceilings, and roofs $1,260 $7,000 $1,260
47,420
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $370 $220 $160
6,190
kWh
$210
-
kW-mo/yr
04 2.3191: Use demand controller or load shedder $1,540 - - $1,540
-
kW-mo/yr
05 2.2515: Use optimum thickness insulation $110 $150 $110
4,112
kWh
-
TOTAL RECOMMENDED $4,420 $7,750 $2,150
81,182
kWh
$2,270
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs