ITAC Assessment: UU0095
ITAC logo
ITAC Assessment: UU0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product ice cream
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range greater than $500
M
# of Employees 70
Plant Area 160,000
ft2
Annual Production 18,000
Tgal
Production Hrs. Annual 4,992
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,360 $2,000 - - $4,360
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $23,800 $20,000 - - $23,800
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $54,985 $40,000 $44,690
1,489,610
kWh
$10,295
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $710 $305 $370
12,200
kWh
$340
-
kW-mo/yr
-
05 2.2136: Install / repair insulation on steam lines $7,720 $450 $7,720
24,000
kWh
- -
TOTAL RECOMMENDED $91,575 $62,755 $52,780
1,525,810
kWh
$10,635
-
kW-mo/yr
$28,160
-
MMBtu
TOTAL IMPLEMENTED $4,360 $2,000 - - $4,360
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs