ITAC Assessment: CO0559
ITAC logo
ITAC Assessment: CO0559
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Ice cream
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $5
M
to 10
M
# of Employees 67
Plant Area 58,600
ft2
Annual Production 8,000
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,876 8,531,807
kWh
Electricity Demand $271,377 36,865
kW-mo/yr
Electricity Fees $5,035 -
Natural Gas $49,810 8,829
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,487 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,837

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,070 $440 $4,120
144,400
kWh
$2,950
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $355 $416 $168
5,878
kWh
$187
-
kW-mo/yr
- -
03 2.3191: Use demand controller or load shedder $1,190 $740 - $1,190
-
kW-mo/yr
- -
04 2.2711: Utilize outside air instead of conditioned air for drying $1,180 $810 $640
22,300
kWh
$540
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $710 $1,790 - - $710
-
MMBtu
-
06 2.7135: Install occupancy sensors $1,760 $2,260 $960
33,500
kWh
$800
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $572 $292 $372
13,015
kWh
$312
-
kW-mo/yr
- $(-112.0)
08 2.7491: Insulate glazing, walls, ceilings, and roofs $650 $4,550 $350
12,200
kWh
$300
-
kW-mo/yr
- -
TOTAL RECOMMENDED $13,487 $11,298 $6,610
231,293
kWh
$6,279
-
kW-mo/yr
$710
-
MMBtu
$(-112.0)
TOTAL IMPLEMENTED $12,837 $6,748 $6,260
219,093
kWh
$5,979
-
kW-mo/yr
$710
-
MMBtu
$(-112.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs