Assessment Year | 1989 |
---|---|
Principal Product | HYDRAULIC HOSE COUPLINGS |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
n/a
|
Annual Production | 30,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $277,381 | 4,223,036 |
kWh
|
$0.066 |
Natural Gas | $27,667 | 7,514 |
MMBtu
|
$3.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,537 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,014 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4312: Improve lubrication practices | $12,199 | - |
$12,199
185,815
kWh
|
- | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,836 | - |
$5,256
-
kWh
|
- | $(-420.0) | |
03 | 2.7261: Install timers and/or thermostats | $2,703 | $750 | - |
$2,703
-
MMBtu
|
- | |
04 | 2.4322: Use or replace with energy efficient substitutes | $2,138 | $750 | - |
$2,138
-
MMBtu
|
- | |
05 | 2.8113: Purchase gas directly from a contract gas supplier | $2,710 | - | - |
$2,710
-
MMBtu
|
- | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $1,350 | $450 |
$(-62.0)
(-879)
kWh
|
$1,412
-
MMBtu
|
- | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $935 | $5,000 | - |
$935
-
MMBtu
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $573 | $3,346 |
$573
8,792
kWh
|
- | - | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $415 | $2,000 | - |
$415
-
MMBtu
|
- | |
10 | 2.6232: Install set-back timers | $481 | $400 |
$481
7,327
kWh
|
- | - | |
11 | 2.1233: Analyze flue gas for proper air/fuel ratio | $197 | $500 | - |
$297
-
MMBtu
|
$(-100.0) | |
TOTAL RECOMMENDED | $28,537 | $13,196 |
$18,447
201,055
kWh
|
$10,610
-
MMBtu
|
$(-520.0) | ||
TOTAL IMPLEMENTED | $8,014 | $5,446 |
$992
15,240
kWh
|
$7,122
-
MMBtu
|
$(-100.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs